presenting the project:

IBC in Paris, France

IBC (International Broadcasting Center) in Paris, France

This PMS project in Paris successfully utilized the self-supporting construction method for the first time. While Technoglobal introduced new structural elements and methods necessary for a self-supporting interior structure with quality finishes, the Company reused the majority of materials from the project in Beijing, offering a unique proposition in sustainability for temporary installations.

Project details at a glance:


  • Areas of TG’s work= fit-out

  • Total Surface Area= 35,000 m2

  • Admin Stuff=15

  • Workforce=100

  • Construction Time= 5 months

  • Estimated Dismantling Time= 2 months.