IBC (International Broadcasting Center) in Paris, France
This PMS project in Paris successfully utilized the self-supporting construction method for the first time. While Technoglobal introduced new structural elements and methods necessary for a self-supporting interior structure with quality finishes, the Company reused the majority of materials from the project in Beijing, offering a unique proposition in sustainability for temporary installations.
Project details at a glance:
- Areas of TG’s work= fit-out
- Total Surface Area= 35,000 m2
- Admin Stuff=15
- Workforce=100
- Construction Time= 5 months
- Estimated Dismantling Time= 2 months.
Type:
Panel Modular Solution