IBC (International Broadcasting Center) in Pyeongchang, South Korea
This project proved the expected. 90% material reuse from Rio De Janeiro with high quality results,
exceptional construction details and professionalism in all aspects of H&S procedures, supervision
and quality control.
Project details at a glance:
- Areas of TG’s work= fit-out
- Total Surface Area= 31,000 m2
- Admin Stuff=13
- Workforce=105
- Construction Time= 4 months
- Estimated Dismantling Time= 1.5 months
Type:
Panel Modular Solution