Refugee Settlement, Uganda
Our team undertook the construction of 48 prefabricated house units in the Bidibidi refugee settlement, as well as the solar panel systems in Midigo Hospital and Yumbe health centre in Uganda.
The materials used for the construction consisted entirely from the reusable materials from previous constructions and the project was completed in 20 days from a team of 22 technicians.
Project details at a glance:
- Total Surface Area(housing Units) = 960 m2
- Total Surface Area(container Units) = 480 m2
- Solar Panel Systems = 1x25kW, 1x5kW
- Admin Stuff = 1
- Workforce= 21
- Construction Time= 20 days
- Containers for material transportation = 16 x 40ft. HC ocean containers
Type:
Reusable Building Solution