loading
 

   Gotthardstrasse 2 - Switzerland, 6300 Zug

   +41 76-297-00-10

presenting the project:

IBC in Tokyo, Japan

IBC (International Broadcasting Center) in Tokyo, Japan

The IBC in Tokyo, Japan was built with materials that were used in Rio de Janeiro and Pyeongchang IBCs (90% reusability), yet the final result stands out as one of the finest IBCs ever built. Every component of the PMS system was carefully designed with reusability in mind, minimizing the risk of damage during both installation and dismantling. Professional packaging and careful handling of the palletized materials before and after installation ensured safe storage and transport across continents.

Health & Safety regulations were strictly followed, with extensive training and regular follow-up sessions to maintain a safe working environment. Rigorous quality control at every stage guaranteed that all recommended construction methods were applied, and timely adjustments were made as needed to deliver a high-quality outcome.

Covid-19 pandemic caused the postponement of the event by one year. Technoglobal’s installations were completed before the postponement and the structure remained intact for one year until operations could commence.
Project details at a glance:


  • Areas of TG’s work= fit-out

  • Total Surface Area= 41,500 m2

  • Admin Stuff=20

  • Workforce=120

  • Construction Time= 6 months

  • Estimated Dismantling Time= No dismantling took place.


Type:

Panel Modular Solution

Images